BER Before: G – After: A2

Before: BER G

After: BER A2

The challenge: Bungalow built in 1983 partial fill cavity walls, minimal attic insulation and single glazed windows and doors.  Heating is via an oil range cooker boiler with an open fire in the living room.  House is cold and draughty. 

Client Requirements: To make the house warm and comfortable by reducing the heat loss and improving the heat efficiency within the specified budget.

Works Included:

  • Specification, Grant Coordination and Works Completion
  • Future Proof uPVC windows and doors.
  • Full fill cavity wall insulation.
  • Attic insulation upgrade.
  • Air to Water Heat Pump with time and temperature control.
  • Installation of new pipework to radiators
  • Rads upsized to match heat loss
  • Replumb and all new hot/cold pipework
  • 200 litre factory insulated hot water cylinder.
  • Unused chimney permanently sealed.
  • Air tightness improved to < 5 m3/(h*m2 surface area)
  • 2kW Solar PV System

Share This Project

More To Explore

BER Before: E1 – After: A3

The challenge: Bungalow built in 1977, 70mm cavity filled with wool, 200mm attic insulation and double-glazed windows and doors.  Heating is via a regular oil boiler with an open fire...

BER Before: G – After: A3

The challenge: Mass concrete architecturally designed house constructed in 1939 with single glazed aluminium windows.  Heating is via storage heaters with a stove in the living room and oil range...